Now that everything is in the case and the control buttons are wired up it’s time to look at providing power to motors and get things turning. Before I rush into that though it’s time to correct and oversight.
-
Yeti – Electrical Build Part 6
The mounting panel now sports all the parts that will go into the case (except the PMDX, but the standoffs are in) so I moved on to fitting the various buttons, lights and dials to the cabinet door.
-
Yeti – Electrical Build Part 5
With the basic circuit checked and holes drilled for everything that would mount to the panel it was time to get the panel into the case.
-
Yeti – Electrical Build Part 4
Now that I had the power supply cornered and exactly where I wanted it it was time to mount the other components on the panel.
-
Yeti – Electrical Build Part 3
With the power supply frame completed I moved onto the mounting plate.
-
Yeti – Electrical Build Part 2
Now that I had a layout it was time to start the build and the first thing I did was change part of the plan…
-
Yeti – Electrical Build Part 1
I’ve received most of the electrical parts now so it’s time to start the build. The first thing to do is a dry run laying them out in the case. Before I get into laying out the parts though here’s…
-
Yeti – Electrical Design Part 3
There comes a time in every project when you have to just get a grip and get on with it and damn the consequences and I think I’ve got to that stage with the electrical part of this build. I’m…
-
Yeti – Electrical Design Part 2
I’ve been reading everything I can get my hands on regarding the electrical design for this machine but I’m still mostly stumbling around in the dark. Everyone else seems to find it trivially easy and I suppose in some ways…
-
Yeti – Limit Sensors
Limit switches or sensors are not absolutely required on a machine, it will work just fine without, but they are a very good addition as they prevent potentially expensive and dangerous crashes. There are three levels of safety when it…
-
Yeti – Electrical Design Part 1
I always knew that the electrical side of this project would be difficult but I hadn’t realised quite how difficult it would be. With the mechanical aspects of the build at least you can look at either the part or…
-
Yeti – Component Purchase
Since the last article all the way back in September the build hasn’t moved very far forward but I thought it was time for an update as a few interesting things happened in the last couple of days. My main…
-
Yeti – Beginning Yeti
Those of you following my build logs will have noticed that the Wyvern machine build seems to have ground to a halt (as of Sept 2013). There was nothing inherently wrong with the build (although I can now see several…
-
Wyvern – Welder Purchase – Day 22
Yet again it’s been a while since the last update because I’ve been debating what the best way forward is (read being indecisive for debating). As I mentioned in the last entry the bolting together plan was working, mostly, but…
-
Wyvern – Frame Building – Day 21
I’ve not managed to get much done over the last few days as work has been getting in the way, I suppose I need to do something to pay for all this CNC equipment though. I’ve got all of the…